City Thameslink railway station

City Thameslink National Rail
City Thameslink stn southbound.JPG
Looking south from the station
City Thameslink is located in Central London
City Thameslink
City Thameslink
Location of City Thameslink in Central London
LocationHolborn Viaduct / Ludgate Hill
Local authorityCity of London
Managed byThameslink
OwnerNetwork Rail
Station codeCTK
DfT categoryC1
Number of platforms2
AccessibleYes
Fare zone1
National Rail annual entry and exit
2017–18Increase 6.433 million
– interchangeIncrease 16,060
2018–19Increase 7.150 million
– interchangeIncrease 68,971
2019–20Increase 8.073 million
– interchangeDecrease 62
2020–21Decrease 0.974 million
– interchangeDecrease 12
2021–22Increase 2.995 million
– interchangeIncrease 37
Key dates
29 May 1990Opened as St. Paul's Thameslink
30 September 1991Renamed City Thameslink
Other information
External links
WGS8451°30′59″N 0°06′13″W / 51.5163°N 0.1037°W / 51.5163; -0.1037Coordinates: 51°30′59″N 0°06′13″W / 51.5163°N 0.1037°W / 51.5163; -0.1037
 London transport portal

City Thameslink is a central London railway station within the City of London, with entrances on Ludgate Hill and Holborn Viaduct. The station is on the Thameslink route between Blackfriars to the south and Farringdon to the north.

The station opened in 1990 to replace Holborn Viaduct railway station. It was part of the Thameslink project that re-opened the Snow Hill Tunnel to provide a continuous north–south route across London. Originally named St. Paul's Thameslink, it was renamed City Thameslink the following year to avoid confusion with the nearby St Paul's tube station on the Central line. The station was refurbished in 2010–11 to increase capacity, and the timetable was revised in 2018 with the introduction of automatic signalling.

Name and location

Northern entrance on Holborn Viaduct

The station is near the western edge of the City of London, close to its border with the City of Westminster. It has two entrances, one on Ludgate Hill and another on Holborn Viaduct, both of which access the two platforms. It is one of the few main line stations in central London that does not have an interchange with the London Underground; it is roughly equidistant from Chancery Lane and St Paul's on the Central line. A planned Tube station in the immediate area, to be named Ludgate Circus, was ultimately never built.

Although City Thameslink is a through-station, for ticketing purposes it is classed as a London terminus for Thameslink services to and from the south. It is in Travelcard Zone 1 and one of the "core stations" on the Thameslink route, along with St Pancras, Farringdon and Blackfriars. The name has come in for criticism as being uninspiring.

Several London Buses routes pass the station, 8; 25; 46; 521 and night routes N8 and N25.

History

St Paul's Thameslink station shortly after opening, with the remains of Holborn Viaduct railway station in the background
Changes in 1990
Legend
Smithfield sidings
Holborn Viaduct
1874–1990
1874–1916
City Thameslink
1865–1929
Blackfriars

Opening

The Thameslink line opened in 1988 after the Snow Hill tunnel, closed to passengers since 1916, was re-opened to provide a through route to Farringdon and King's Cross from South London. Initially, trains used the approach viaduct for the now-closed Holborn Viaduct station. The new service was an immediate financial success, and it was decided to redevelop the Holborn Viaduct site with a new station and business complex. The work was part-financed by the London property developer Rosehaugh Stanhope.

Before Holborn Viaduct closed, a new line between Blackfriars and the tunnel was constructed on a different alignment slightly to the east and at a lower elevation, providing the opportunity to build 600,000 square feet (56,000 m2) of office space above the station on a 4-acre (1.6 ha) site. City Thameslink was built to replace Holborn Viaduct station. The total cost was estimated at between £360 and £450 million. Because of a proposed routing for the second phase of the Jubilee line through the area, part of the station was built to allow for a future interchange.

Holborn Viaduct closed on 26 January 1990. All Thameslink services were suspended for 17 days the following May so that demolition work could be carried out.

The station was opened by British Rail on 29 May 1990 as St. Paul's Thameslink, and was renamed to City Thameslink on 30 September 1991 to avoid confusion with the St Paul's Central line station on the London Underground, which is several hundred yards to the east, to the north of St Paul's Cathedral. It was the first mainline station built in central London in almost 100 years. The station was designed by SAS International, who designed the original walls and panelling.

In conjunction with construction of the new station, the area around the old Holborn Viaduct and Ludgate Hill stations was redeveloped and an old bridge across Ludgate Hill was removed. In 1992, following the demolition, an additional service tunnel was constructed connecting City Thameslink to Farringdon.

When the Thameslink franchise was awarded to First Capital Connect (FCC) in 2006, the Thameslink service was re-branded but City Thameslink was not renamed. By late 2010, FCC had reverted to the Thameslink name.

Recent events

As part of the Thameslink Programme, an upgrade of City Thameslink station was completed in 2010. The upgrade was important because the closure of Blackfriars later in the year would lead to increased footfall. The platforms were made ready for future 12-carriage trains, and the passenger information system improved. New lighting, ticket gates and CCTV cameras were installed, and the service announcement system was upgraded to provide more accurate train times. SAS retrofitted the station interior, as they had done for the original 1990 construction, with enamel wall panels that fitted the original design specification.

In a 2014 report, London TravelWatch suggested an underground passageway linking City Thameslink to St Paul's tube station to provide an interchange with the Central line that would benefit passengers travelling from the Central line catchment to Gatwick and Luton Airports.

In 2018, Govia Thameslink Railway announced a major timetable change, which was implemented that May. The changes included a half-hour service across Central London, connecting City Thameslink with Gatwick Airport and Luton Airport Parkway. The signalling was upgraded to support automatic train operation through the station, along with the rest of the core Thameslink route, and British Rail Class 700 trains were introduced into the service. The following January, several evening services from City Thameslink to St Albans and Harpenden were reinstated, after a six-month absence.

Services

City Thameslink is served by trains operated by Thameslink on the Thameslink Route which run Monday-Saturday only with the station being closed on Sundays. Train services are operated using Class 700 Desiro City EMUs.

The typical off-peak service in trains per hour is:

Preceding station National Rail National Rail Following station
Thameslink
Monday-Saturday only

City Thameslink serves as the lost property office of the Thameslink line. A fee is charged for retrieving property.

Connections

London Buses routes 8, 11, 15, 17, 25, 26, 40, 46, 56, 63, 76, 242, 341, 521 and night routes N8, N11, N15, N21, N25, N26, N63, N89, N199, N242, N550 and N551 serve the station.


This page was last updated at 2023-01-05 11:31 UTC. Update now. View original page.

All our content comes from Wikipedia and under the Creative Commons Attribution-ShareAlike License.


Top

If mathematical, chemical, physical and other formulas are not displayed correctly on this page, please useFirefox or Safari