Nuclear power was used in Germany from the 1960s until being phased out in April 2023.

German nuclear power began with research reactors in the 1950s and 1960s, with the first commercial plant coming online in 1969. By 1990, nuclear power accounted for about a fourth of the electricity produced in the country.

The anti-nuclear movement in Germany has a long history dating back to the early 1970s and intensified following the Chernobyl disaster in 1986. After the March 2011 Fukushima nuclear disaster and subsequent anti-nuclear protests, the government announced that it would close all of its nuclear power plants by 2022. Eight of the seventeen operating reactors in Germany were permanently shut down following Fukushima.

Nuclear power accounted for 13.3% of German electricity supply in 2021, supplied by six power plants. Three of these were switched off at the end of 2021 and the other three ceased operations by April 2023.

History

Early nuclear research in Germany

Prior to the takeover of Nazi Germany, German universities were the employers of some of the world's most renowned nuclear physicists, including Albert Einstein, Otto Hahn, Lise Meitner, Leo Szilard and others. In 1938 Hahn and his colleague Fritz Straßmann conducted an experiment designed by Lise Meitner (who had already been driven into exile due to her Jewish ancestry) which led to the discovery of nuclear fission. Soon thereafter a "race" began between the soon to be belligerents of World War II to find - military or civilian - applications of the new technology. Hampered by infighting, lack of resources, mistakes and the suspicion of Nazi authorities against "Jewish physics", the Uranverein ("uranium club") led by Werner Heisenberg never got close to building a Uranmaschine ("uranium machine" - what the Americans called a "pile") that achieved criticality, let alone building a nuclear weapon. When the Americans took over the last German attempt at a research reactor during the war at Haigerloch in southwestern Germany, it was clear to the people involved in the Alsos Mission that Germany had fallen behind the Manhattan project to a considerable degree.

First nuclear power plants

As in many industrialised countries, nuclear power in Germany was first developed in the late 1950s. Only a few experimental reactors went online before 1960, and an experimental nuclear power station in Kahl am Main opened in 1960. All of the German nuclear power plants that opened between 1960 and 1970 had – as in the rest of the world at that time – a power output of less than 1,000 MW and have now all closed down. The first almost fully commercial nuclear power plant started operating in 1969: Obrigheim operated until 2005, where it was shutdown by phaseout decision of the government. The first station with a power output of more than 1000 MW each were the two units of Biblis Nuclear Power Plant in 1974 and 1976.

In the early 1960s there was a proposal to build a nuclear power station in West Berlin, but the project was dropped in 1962. Another attempt to site a reactor in a major city was made in 1967, when BASF planned to build a nuclear power station on its ground at Ludwigshafen, to supply process steam. The project was withdrawn by BASF.

Attempts at developing a closed fuel-cycle and breeding reactors

A closed nuclear fuel cycle was planned, starting with mining operations in the Saarland and the Schwarzwald; uranium ore concentration, fuel rod filling production in Hanau; and reprocessing of the spent fuel in the never-built nuclear fuel reprocessing plant at Wackersdorf. The radioactive waste was intended to be stored in a deep geological repository, as part of the Gorleben long-term storage project. Today, there is a "ergebnisoffener" searching process over the whole country for the storage of the irradiated nuclear fuel.

In 1959, 15 municipal electric companies established the Association of Experimental Reactor GmbH (Arbeitsgemeinschaft Versuchsreaktor, AVR) to demonstrate the feasibility and viability of a gas-cooled, graphite-moderated high temperature reactor (HTGR). In the early 1960s, it started the design and construction of AVR at the Jülich Research Centre. First criticality was attained in 1966, and the AVR was in operation for more than 22 years. Despite the fuel feed and discharge system showed excellent availability, the AVR was shut down for political reasons in 1988. The AVR was designed to breed uranium-233 from thorium-232. Thorium-232 is over 100 times as abundant in the Earth's crust as uranium-235.

In 1965, before the AVR started operation, a basic design for a commercial demonstration HTGR reactor using thorium was started, the THTR-300. The HTGR, rated at 300 MWe, synchronized with the grid in 1985. Six months later a fuel pebble became lodged in the reactor core. After repairs, it was restarted and operated from July 1986, reaching full power in September 1986. It operated until September 1988, and was shutdown in September 1989.

Early opposition and reactor closures

In the early 1970s, large public demonstrations prevented the construction of a nuclear plant at Wyhl. The Wyhl protests were an example of a local community challenging the nuclear industry through a strategy of direct action and civil disobedience. Police were accused of using unnecessarily violent means. Anti-nuclear success at Wyhl inspired nuclear opposition throughout Germany and elsewhere.

The ruins of the incomplete Stendal NPP reactor building

The Rheinsberg Nuclear Power Plant was the first (mostly experimental) nuclear power plant in East Germany. It was of low power and operated from 1966 until 1990. The second to be commissioned, the Greifswald Nuclear Power Plant, was planned to house eight of the Russian 440 MW VVER-440 reactors. The first four went online between 1973 and 1979. Greifswald 5 operated for less than a month before it was closed, the other three were cancelled during different stages of their build-up. In 1990, during the German reunification, all eastern Germany nuclear power plants were closed due to flaws in safety standards. The Stendal Nuclear Power Plant in East Germany was to be the largest nuclear power station in Germany. After German reunification, and due to concerns about the Soviet design, construction was stopped and the power station was never completed. In the 1990s the three cooling towers which had been erected were demolished, and the area is an industrial estate today.

By 1992, a group of German and Swiss firms planned to proceed with construction of a HTR-500, a design that made considerable use of the THTR-300 technology. But the by then politically hostile environment in the light of the Chernobyl disaster as well as technical issues with the THTR-300 halted any effort. The technology is now pursued by the Chinese as the HTR-PM.

First phase-out proposal

Anti-nuclear protest near nuclear waste disposal centre at Gorleben in northern Germany on 8 November 2008. The banner reads "Only the risk is certain. Atomic power? No thanks!"

During the chancellorship of Gerhard Schröder, the social democratic-green government had decreed Germany's final retreat from using nuclear power by 2022, but the phase-out plan was initially delayed in late 2010, when during chancellorship of center-right Angela Merkel the coalition conservative-liberal government decreed a 12-year delay of the schedule. This delay provoked protests, including a human chain of 50,000 from Stuttgart to the nearby nuclear plant in Neckarwestheim. Anti-nuclear demonstrations on 12 March attracted 100,000 across Germany.

Eight of the seventeen operating reactors in Germany were permanently shut down following the March 2011 Fukushima nuclear disaster.

On 14 March 2011, in response to the renewed concern about the use of nuclear energy the Fukushima incident raised in the German public and in light of upcoming elections in three German states, Merkel declared a 3-month moratorium on the reactor lifespan extension passed in 2010. German engineering-industry giant Siemens announced a complete withdrawal from the nuclear industry in 2011, as a response to the Fukushima nuclear disaster. On 15 March, the German government announced that it would temporarily shut down 8 of its 17 reactors, i.e. all reactors that went online before 1981. Former proponents of nuclear energy such as Angela Merkel, Guido Westerwelle, and Stefan Mappus changed their positions. In the largest anti-nuclear demonstration ever held in Germany, some 250,000 people protested on 26 March 2011, under the slogan "heed Fukushima – shut off all nuclear plants".

Phase-out decision

On 30 May 2011, the German government announced a plan to shut all nuclear reactors by 2022. Prior to the decision, Germany's renewable energy sector already provided 17% of Germany's electricity and employed about 370,000. The decision to phase-out nuclear power has been called the swiftest change of political course since unification.

Political writer David Frum characterized Merkel's decision as a political move to improve her approval ratings which had sagged after the post 2008 financial crisis bailout of southern Europe by Germany.

In September 2011, Siemens, which had been responsible for constructing all 17 of Germany's existing nuclear power plants, announced that it would exit the nuclear sector following the Fukushima disaster and the subsequent changes to German energy policy, and would no longer build nuclear power plants anywhere in the world.

Merkel stated that Germany "[does not] only want to renounce nuclear energy by 2022, we also want to reduce our CO2 emissions by 40 percent and double our share of renewable energies, from about 17 percent today to then 35 percent".

Before 2011, Germany was getting just under a quarter of its electricity from nuclear power. After the Fukushima disaster, the following eight German nuclear power reactors were declared permanently shut down on 6 August 2011: BiblisA andB, Brunsbuettel, Isar1, Kruemmel, Neckarwestheim1, Philippsburg1 and Unterweser.

Global status of nuclear deployment (2022):
 Operating reactors, building new reactors
 Operating reactors, planning new build
 No reactors, building new reactors
 No reactors, new in planning
 Operating reactors, stable
 Operating reactors, decided on phase-out
 Civil nuclear power is illegal
 No reactors
Gross generation of electricity by source in Germany from 1990 to 2020, which shows the shift from nuclear and coal to renewables and fossil gas

On 5 December 2016, the Federal Constitutional Court (Bundesverfassungsgericht) ruled that the nuclear plant operators affected by the accelerated phase-out of nuclear power following the Fukushima disaster are eligible for "adequate" compensation. The court found that the nuclear exit was essentially constitutional but that the utilities are entitled to damages for the "good faith" investments they made in 2010. The utilities can now sue the German government under civil law. E.ON, RWE, and Vattenfall are expected to seek a total of €19billion under separate suits. Six cases were registered with courts in Germany, as of 7 December 2016.

As of March 2019, only seven nuclear plants had been left in operation and should be scheduled to be shut down and dismantled. As of early 2022, three plants remain for the final year.

Renewed debate

After Russia invaded Ukraine in 2022, German energy policy – which had up to that point relied on Russian imports (particularly natural gas) to a large degree – was re-evaluated, including a temporary suspension of the controversial Nord Stream 2 pipeline. The German minister of economy and climate, Robert Habeck answered in an interview that he would be "open" to extending the life of the remaining three nuclear power plants, but expressed skepticism as to the feasibility of and sense in such a move. Several newspapers called for a re-opening of the debate on the nuclear phaseout, including the Frankfurter Allgemeine Zeitung. The (former) operators of Germany's remaining three nuclear power plants as well as the three reactors that had been shut down in late 2021 (but not yet dismantled) commented that they are "open" to negotiations with the government as to extending the lifetime of those reactors or restarting those that were already shut down. On 21 August 2022, German Economy Minister Robert Habeck said that Germany would not reverse the phase-out itself, but said that he was open to the idea of extending the lifespan of the Isar Nuclear Power Plant in Bavaria, subject to a stress test of Germany's electricity system.

On 5 September 2022, the Federal Government announced that two of the three remaining nuclear power plants (Neckarwestheim and Isar 2) would operate beyond 31 December 2022 until April 2023 (cycle stretch out), while the Emsland Nuclear Power Plant was to be shut down as planned. However, on 10 October 2022, Scholz announced that all three would remain operating until 15 April 2023. Wolfgang Kubicki, deputy leader of the Free Democrats, said in an interview with the Funke Media Group that, "Germany has the safest nuclear power plants worldwide and switching them off would be 'a dramatic mistake' with painful economic and ecological consequences." Other members of the Free Democratic Party have called for the nuclear power plants to be at least maintained as a precautionary measure in case they are needed in the future for power generation.

Reactors

Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
AVR 1 HTGR PBR Prototype Shut down 13 1 Aug 1961 19 May 1969 31 Dec 1988
Biblis 1 PWR Siemens-KWU Shut down/in decommissioning 1167 1 Jan 1970 26 Feb 1975 6 Aug 2011
2 PWR KWU Shut down/in decommissioning 1240 1 Feb 1972 31 Jan 1977 6 Aug 2011
Brokdorf 1 PWR KWU Shut down 1410 1 Jan 1976 22 Dec 1986 31 Dec 2021
Brunsbüttel 1 BWR BWR-69 Shut down 771 15 Apr 1970 9 Feb 1977 6 Aug 2011
Emsland 1 PWR Konvoi (KWU) Shut down 1329 10 Aug 1982 20 Jun 1988 15 Apr 2023
Grafenrheinfeld 1 PWR KWU Shut down 1275 1 Jan 1975 17 Jun 1982 27 Jun 2015
Greifswald 1 PWR VVER-440/V-230 Shut down/in decommissioning 408 1 Mar 1970 12 Jul 1974 14 Feb 1990
2 PWR VVER-440/V-230 Shut down/in decommissioning 408 1 Mar 1970 16 Apr 1975 14 Feb 1990
3 PWR VVER-440/V-230 Shut down/in decommissioning 408 1 Apr 1972 1 May 1978 28 Feb 1990
4 PWR VVER-440/V-230 Shut down/in decommissioning 408 1 Apr 1972 1 Nov 1979 22 Jul 1990
5 PWR VVER-440/V-213 Shut down/in decommissioning 408 1 Dec 1976 1 Nov 1989 24 Nov 1989
6 PWR VVER-440/V-213 Finished; never entered service 408
Grohnde 1 PWR KWU Shut down 1360 1 Jun 1976 1 Feb 1985 31 Dec 2021
Grosswelzheim 1 BWR BWR Dismantled 25 1 Jan 1965 2 Aug 1970 20 Apr 1971
Gundremmingen A BWR GE, BWR-1 Shut down/in decommissioning 237 12 Dec 1962 12 Apr 1967 13 Jan 1977
B BWR BWR-72 (KWU) Shut down 1284 20 Jul 1976 19 Jul 1984 31 Dec 2017
C BWR BWR-72 (KWU) Shut down 1288 20 Jul 1976 18 Jan 1985 31 Dec 2021
Isar 1 BWR BWR-69 Shut down/in decommissioning 878 1 May 1972 21 Mar 1979 6 Aug 2011
2 PWR Konvoi (KWU) Shut down 1410 15 Sep 1982 9 Apr 1988 15 Apr 2023
Kahl 1 BWR BWR Dismantled 15 1 Jul 1958 1 Feb 1962 25 Nov 1985
SNR-300 1 FBR Finished; never entered service 1972 1985
KNK II 1 FBR Shut down 17 1 Sep 1974 3 Mar 1979 23 Aug 1991
Krümmel 1 BWR BWR-69 (KWU) Shut down 1346 5 Apr 1974 28 Mar 1984 6 Aug 2011
Lingen 1 BWR BWR Shut down 183 1 Oct 1964 1 Oct 1968 5 Jan 1977
Mülheim-Kärlich 1 PWR B & W Shut down/in decommissioning 1219 15 Jan 1975 8 Aug 1987 9 Sep 1988
MZFR 1 PHWR PHWR Shut down 52 1 Dec 1961 19 Dec 1966 3 May 1984
Neckarwestheim 1 PWR KWU Shut down 785 1 Feb 1972 1 Dec 1976 6 Aug 2011
2 PWR Konvoi (KWU) Shut down 1310 9 Nov 1982 15 Apr 1989 15 Apr 2023
Niederaichbach 1 HWGCR Pressure tube reactor Shut down/decommissioned 100 1 Jun 1966 1 Jan 1973 31 Jul 1974
Obrigheim 1 PWR Siemens Shut down/in decommissioning 340 15 Mar 1965 31 Mar 1969 11 May 2005
Philippsburg 1 BWR BWR-69 Shut down 890 1 Oct 1970 26 Mar 1980 6 Aug 2011
2 PWR KWU Shut down 1402 7 Jul 1977 18 Apr 1985 31 Dec 2019
Rheinsberg 1 PWR VVER-70 Shut down/in decommissioning 62 1 Jan 1960 11 Oct 1966 1 Jun 1990
Stade 1 PWR Siemens Shut down/in decommissioning 640 1 Dec 1967 19 May 1972 4 Nov 2003
Stendal 1 PWR VVER-1000/V-320 Unfinished 1983 1990
2 PWR VVER-1000/V-320 Unfinished 1983 1990
3 PWR VVER-1000/V-320 Never built
4 PWR VVER-1000/V-320 Never built
THTR-300 1 HTGR PBR Decommissioned 296 3 May 1971 1 Jun 1987 29 Sep 1988
Unterweser 1 PWR KWU Shut down/in decommissioning 1345 1 Jul 1972 6 Sep 1979 6 Aug 2011
Würgassen 1 BWR BWR-69 (AEG) Shut down/in decommissioning 640 26 Jan 1968 11 Nov 1975 26 Aug 1994

Radioactive waste management

Nuclear power plants take years to be dismantled and contaminated sites have to be cleared and declared free of radiation. One estimate puts the cost of dismantling Germany's nuclear reactor sites at €18 billion, not counting the cost of radioactive waste disposal.

No country has permanent storage sites for nuclear energy waste and spent nuclear fuel is stockpiled in temporary locations. In Germany, heavily contaminated spent fuel rods are stored in Castor containers on several temporary sites around the country.

Germany is preparing the former iron-ore mine Schacht Konrad in Salzgitter as a national facility for the permanent disposal of low- to medium-grade radioactive waste materials.

Nuclear Waste Disposal Fund

On 19 October 2016, the German cabinet (Bundeskabinett) finalized a deal with nuclear power plant operators E.ON, EnBW, RWE, and Vattenfall over long-term nuclear waste disposal. Under the agreement, the four operators are freed of responsibility for storing radioactive waste – that responsibility is instead transferred to the state. In return, the operators will pay a total of €17.4billion into a state-administered fund to finance the interim and final storage of nuclear waste. They will also pay an additional "risk surcharge" of €6.2billion (35.5%) to cover the eventuality that costs exceed current projections and that the interest accrued by the fund is lower than expected. The operators will be responsible for decommissioning and deconstructing their own nuclear power plants, as well as preparing their radioactive waste for final storage.

Critics, including the German Renewable Energy Federation and BUND, claim the total of €23.6billion would prove insufficient and that future taxpayers will carry the risk.

Transmutation

While the official policy of Germany is to dispose of spent fuel in a deep geological repository inside Germany's borders, Germany is also involved in research into nuclear transmutation of high level waste (primarily Actinides, which account for most of the long-term radiotoxicity of spent nuclear fuel). An important research project underway in Belgium is MYRRHA which relies on German suppliers for the particle accelerator which is in a sense the "heart" of every Accelerator Driven System and whose reliability is the key issue to be solved before such systems can be commercialized.

Accidents

Nuclear power accidents in Germany
Date Location Description Fatalities Cost
(million 2006 US$)
INES
1975 Greifswald, East Germany A near core meltdown at Greifswald Nuclear Power Plant: Three out of six cooling water pumps were switched off for a failed test. A fourth pump broke down by loss of electric power and control of the reactor was lost. 10 fuel elements were slightly damaged before recovery 0 ? 3
4 May 1986 Hamm-Uentrop, Germany Operator actions to dislodge damaged fuel elements at the Thorium high-temperature reactor released radioactivity to 4 km2 surrounding the facility 0 267 ?
17 December 1987 Hessen, Germany Stop valve failed for a moment at Biblis Nuclear Power Plant; contamination of local area in the reactor building 0 13

Phase-out

Germany decided on a phase-out in 2011. The phase-out was completed in 2023. The country has combined the phase-out with an initiative for renewable energy and wants to increase the efficiency of fossil power plants in an effort to reduce the reliance on coal. According to the former German Minister for the Environment Jürgen Trittin, in 2020, this would cut carbon dioxide emissions by 40 percent compared with 1990 levels. Germany has become one of the leaders in the efforts to fulfill the Kyoto protocol. Critics of the German policy have called it a mistake to abandon nuclear power, claiming the only alternative to nuclear power was coal and abandoning nuclear power was therefore contradictory to the goal of lowering CO2 emissions.

As a result of generous subsidies, Germany has installed a large solar and wind generation capacity. At the same time, Germany continues to rely heavily on coal power, with usage increasing to offset the phase-out of nuclear energy.

The German nuclear industry has insisted that its shutdown would cause major damage to the country's industrial base. In 2012, member firms of the Verband der Industriellen Energie- und Kraftwirtschaft (VIK) reported power failures of several seconds duration, combined with a rise in frequency fluctuations. These were reportedly caused by network overloads due to the shutdown of nuclear power plants, and an increase in wind power generation. VIK also fear that industrial control units will be damaged by outages.

The cost of replacing Germany's nuclear power generation with renewable energy has been officially estimated by the German Ministry of Economics at about €0.01/kWh (about €55 billion for the next decade[when?]), on top of the €13 billion per year already devoted to subsidizing renewables. However, unofficial estimates of the ministry, and of the Rhenish-Westphalian Institute for Economic Research (RWI), German Energy Agency (DENA), Federation of German Consumer Organizations (VZBV), and the government-owned development bank (KfW), put the cost several times higher, at about €250 billion ($340 B) over the next decade.[when?]

Some German manufacturers and energy companies have criticized the phase-out plans, warning that Germany could face blackouts. While this did not happen there has been an increase in voltage fluctuations which has damaged industrial facilities and caused them to install voltage regulators. A 2020 study found that the lost nuclear electricity production has been replaced primarily by coal-fired production and net electricity imports. The social cost of this shift from nuclear to coal is approximately €3 to €8 billion annually, mostly from the eleven hundred additional deaths associated with exposure to the local air pollution emitted when burning fossil fuels. Swedish energy company Vattenfall went in front of the World Bank's International Centre for Settlement of Investment Disputes (ICSID) to seek compensation from the German government for the premature shut-down of its nuclear plants.

In March 2013, the administrative court for the German state of Hesse ruled that a three-month closure imposed by the government on RWE's Biblis A and B reactors as an immediate response to Fukushima Daiichi accident was illegal. The state ministry of the environment acted illegally in March 2011, when an order was issued for the immediate closure of the Biblis units. RWE complied with the decree by shutting Biblis-A immediately, however as the plants were in compliance with the relevant safety requirements, the German government had no legal grounds for shutting them. The court ruled that the closure notice was illegal because RWE had not been given sufficient opportunity to respond to the order.

In 2022, Vox commented that, "Germany’s decision to restart old coal plants rather than extend the life of its nuclear power facilities reflects a failure of environmental priorities" and NPR wrote, "Facing an energy crisis, Germans stock up on candles." In April 2023, several critics of nuclear power plant shutdowns argued that the switching off of nuclear power plants deprives Germany of a source of low- emission power and force the country to continue using fossil fuels that contribute to climate change.

See also


This page was last updated at 2023-12-08 16:17 UTC. Update now. View original page.

All our content comes from Wikipedia and under the Creative Commons Attribution-ShareAlike License.


Top

If mathematical, chemical, physical and other formulas are not displayed correctly on this page, please useFirefox or Safari