The 42 (Kolkata)

The 42
Map
General information
StatusCompleted
TypeResidential Skyscraper
LocationKolkata, West Bengal, India
Address42b, Jawaharlal Nehru Rd., Kolkata, West Bengal, India
Town or cityKolkata
CountryIndia
Coordinates22°32′54″N 88°20′59″E / 22.548276°N 88.349613°E / 22.548276; 88.349613
Groundbreaking2008
Construction started2012
Topped-out2019
Completed2019
Height
Architectural249 m (817 ft)
Tip260 m (820 ft)
Antenna spire260 m (820 ft)
Top floor249 metres (817 ft)
Technical details
MaterialGlass / Reinforced Concrete
Floor count65
Design and construction
Architecture firmHafeez Contractor
DeveloperMani Group, Salarpuria Sattva Group, Diamond Group & Alcove Realty
Main contractorACC India Pvt Ltd (Indian Subsidiary of Arabian Construction Co, Middle East)
Known forTallest building in Kolkata, tallest completed building in India outside Mumbai

The 42 is a residential skyscraper in Kolkata, in the state of West Bengal, India. It is located on Chowringhee Road, the central business district of the city, between the Commercial building of Tata Centre and the residential building of Jeevan Sudha. It was first proposed in 2008 but construction was delayed for nearly two years. The construction of the building was completed in 2019, making it the tallest building in the country at that time.

It is the tallest completed building in India outside of Mumbai.

History

The premises originally belonged to the Maharaja of Darbhanga.

Details

Planned by developers Mani Group, Salarpuria Sattva Group, Alcove Realty & Diamond Group, to be Kolkata's tallest residential building. Located on Chowringhee Road, in the middle of the city, the skyscraper has 65 floors.

Protest

The developers of The 42 have faced a civil suit in the Calcutta High Court filed by ITC Limited, the owners of the adjoining 'Fountain Court' property. The suit filed by ITC claims that ITC's right to receive light and air will be violated by the 65-storeyed residential building being constructed to the west of its 'Fountain Court' property. On 19 August 2013, the Calcutta High Court passed an order that any steps taken by the developers would be subject to the outcome of the case filed by ITC. On 8 May 2014, the Court ordered that the developers of The 42 should not proceed with the construction at a pace to defeat the interests of ITC. (Calcutta High Court, GA Case No 2698 / 2013) The matter is pending before the Calcutta High Court.

Gallery

See also


This page was last updated at 2024-03-07 05:55 UTC. Update now. View original page.

All our content comes from Wikipedia and under the Creative Commons Attribution-ShareAlike License.


Top

If mathematical, chemical, physical and other formulas are not displayed correctly on this page, please useFirefox or Safari